Thursday, March 02, 2006

Pick up the pace picante.....








Things are moving right along, and as well they should be the make the 2nd due date of March 17th. The hardwood floors are in - and that is all I am going to say about that. Once they are finished they will look very nice. The cabinets are in and although we expected the stain to come out darker, they look marvelous! The craftsmanship of Santiam Cabinets is top of the line. The tile is going in this week and the builder has promised me all the tile will be done by Mon 3/6/06. Most of the trim around all of the doors and windows is in and will be painted along with the walls ( and my white ceilings) the week of 3/6/06. Here are a few updated pictures of the cabinets going in and then with the upper doors on and the dining room with the hardwood floors.

Tuesday, February 14, 2006

The outside is painted....yeah!!









Well the outside of the house (the main body, not the trim) was painted on Friday 2/10. The weather was great and things look good. It was also my sister Alaina's birthday that Friday so HAPPY BIRTHDAY ALAINA!

Tuesday, January 31, 2006

Pictures of the creek



I think it's self explanatory.....they are pictures of the creek :)

Stone Entry & Views















Pics from the edge of the property looking back up towards the house. We are currently trying to rehabilitate the pasture from years of too many cattle tromping on it. So far it is coming back nicely, and even draining with all the rain, but Lynn has a major plan for this site.




















Here's the rock wainscot on the left side of the 2-car garage bay.
















This is the right side of the 2-car garage bay.

And this the right side of the 3rd bay.



















Here's the rocked entry - we used El Dorado Stone in Sawtooth Ledge Color.

This is the side of the entry.
Just a more detailed pic of the side and then the arch detail.

Drying the place out.....

As another new challenge has presented itself, we will be trying to get the house dried out in the next week and a half. It shouldn't be hard, since it is pour, well flooding down rain....this is a joke people, although not a funny one. The current moisture level in the house is at 15%, which is high and could potentially cause mold problems IF we were to start putting sheet rock up right away. So our builder placed a couple of torpedo heaters in the house and put insulation up on the garage and house walls that were shared to hold more of the heat in. It would have been optimal if they could have had the permanent power hooked up so that we could use the furnace instead, as that would have been more productive and efficient. The good news is that last Saturday (1/28/06) Lynn was out at the site and spoke to the builder who said that the moisture level had dropped to 10% in the areas he tested downstairs, and upstair there were a couple spots still at 12%. So hopefully running everything throughout the weekend and the first few days of this week will help to get the levels upstairs to drop. I have been told that when building in Oregon (at least the Valley) that even in the summer during the driest time, the moisture levels are still at about 8% due to the humidity. Anything under 12% is good. Now that were done with our moisture lesson, I'll move onto the rest of the pics.














I took one of the Master Shower ......doesn't that dirty shower floor just make you want to hop in - when we move in I will try to forget I ever saw it like this!




















There is also one of the jetted tub, looking out over the property, peaceful, so enticing and the jets are calling to you, the water certainly is not and you would have to shimmy yourself under that piece of lumber, but back to that relaxing place; again this will be another image I delete from my brain files once we move in and everything is shiny.



















Window & view looking out of the Great room.




















The Fireplace, which might I add that Mr. Lynn HAD to have a remote for this since the TV is going upstairs, something needed a remote downstairs. OK so the full truth is that he thought it would be nice to be relaxing on the couch and flick on the fireplace without getting up, and this I agree, would be cool.



















The Entertainment/Display nook - we have not decided as to what exactly will fill this space yet.



















Looking back across at the kitchen, they have the sheet rock up on the ceiling and this week(and the next) the sheetrockers will be finishing up the rest of house inside.














Here is where Lynn will proudly display his hunting trophies; out of the way of #3 (as he has nicknamed the baby.)

Sorry the Well House didn't show up


in the last set of photos. Here it is:
The siding is finally finished and next they will start doing the rock on the entry and a wainscoting of rock in front of the garage.
I am also going to attach a couple of pics taken from out in the pasture looking back up to the house.

Wednesday, January 25, 2006

All the windows are now in and the siding's 98% complete...





All of the windows are now in and the siding is 98% complete. I took pictures from all sides so you could get a better feel of what the whole thing looks like. And I managed to time it between storms. What a lucky person I am....it's probably because of all the Irish dance!!

We also had the Well House installed and it's painted a very similar color to what we will paint the house. It will be given a fresh coat along with the house when the time comes....maybe in a month.

Hi Ho the derry O the siding's coming along




Well they got the siding started in between the rain, I mean flooding, and the roof was completed. However, now due to all the rain, we REALLY need the gutters on. So that will be the next push.

They got the front door in and the garage floor poured. The jobsite is a complete mess!

Tuesday, December 20, 2005

The roof, the roof, the roof is on the house






Finally here are the pictures with most of the roof on. Not long until it's done :)

Even more of the inside framing